top of page
PARTNERS
BECOMES A
SMART FILM INSTALLER
In-depth guidance and continuous support
QUALIFY AS A FILM INSTALLER
STEPS
SFI builds lasting partnerships with film installers. We offer in-depth guidance and continuous support throughout the smart film installation process on existing windows.
In order to qualify as a Film Installer, we recommend the following steps:
This installation is DRY Stick and it usually takes for an experienced film installer 3-4 installations to reach the optimal installation quality.
INSTALLATION OF ADHESIVE FILM
HAS 4 MAIN PARTS
01 | Unpacking & Testing the Film
-
Open the box carefully and put all films on the long table.
-
Connect each film to the power via the transformer and verify all work fine.
03 | Connecting to Power
-
Connecting a 48 VAC transformers with remote or switch or both.
-
Need to weld film wires to the power
02 | Sticking Expertise
-
It is a DRY stick…no water allowed; Industrial Alcohol 90% is allowed
-
Need to clean the glass and film stick side very well, like 2/3 of installation time is glass cleaning
-
Installer needs patience and persistence, not every technical guy fits…
-
To stick the film edge you may need a hair fan to soften the film
04 | Visual & Profiles
-
Client usually expects you to handle not only the film stick but also the frame
-
It is recommended to have a film edge under the frame or the rubber.
-
If not possible to hide the film edge under the frame, look for creative ways to hide it with a tape or a panel.
02 | Sticking Expertise
-
It is a DRY stick…no water allowed; Industrial Alcohol 90% is allowed
-
Need to clean the glass and film stick side very well, like 2/3 of installation time is glass cleaning
-
Installer needs patience and persistence, not every technical guy fits…
-
To stick the film edge you may need a hair fan to soften the film
04 | Visual & Profiles
-
Client usually expects you to handle not only the film stick but also the frame
-
It is recommended to have a film edge under the frame or the rubber.
-
If not possible to hide the film edge under the frame, look for creative ways to hide it with a tape or a panel.
BEFORE installation of adhesive film, please read carefully our Installation Guide
IN ORDER TO BE QUALIFIED AS A FILM INSTALLER, WE RECOMMEND THE FOLLOWING STEPS
-
Buy several A4 size samples, ready to plug in to the power.
-
With these samples you may achieve the following:
-
Showing to potential clients and customers
-
Sticking over a glass
Making several pilots over in your offices
For that purpose, it is recommended:
-
Choosing ~5 small size windows in your office with access to power.
-
Reduce 3mm from each of the 4 sides.
-
If need to cut in for handles or hinges, make a drawing and we will make the cuts
Our shipment to you will include:
-
Film cut per your size with wires already prepared
-
Transformer – output 48/60 VAC – switch + remote
-
Squeezers – tool to make the stick
-
Leftover films to train
-
Installation Guide/Video/Tips
-
Neutral No Alkoxy No ACID Silicone. Silicone MUST be one of these (no warranty for using other brand):
-
Dow Corning: 795, 799, 995, 1199
-
Toshiba: 83, 381
Making a first project with a real client...
Only after Step C is successful we recommend to start
commercially pushing the product.
APPLICATIONS
OUR ADHESIVE FILM PROJECTS
bottom of page